Day 206, Rainy day, Shower thermostatic valve installation, V-berth (last piece, small pillow insert), Drawers stoppers, Finisted Fixed ports, ignition switch.
Shower Thermostatic valve installed. Button is to ope/close shower, and regulator is supposed to control water temperature. so far water is running and not leaking. Short glance under sink. Connection hoses have synthetic cover, hopefully will not disintegrate fast. Fixed windows last touches. Painted frames inside in black to mach with silicon. V-berth. Last touch here too. Rebuilt triangle insert and made a pillow for it. Put hinges on the bottom locker at cabinet and found the locker opening may play as step for V berth. BUT, it will be nice to make a step sliding out when door opened. Head Added handles to head door, For now they are mounted on VHB tape. Door, View from inside Door, view from outside Replaced drawer stoppers. LPG solenoid controller, ready for installation.