Skip to main content

Posts

Showing posts with the label V-berth

Day 117, 12/16/23 Front cabin varnishing COMPLETE. 10 hours

 Interior. Both cabins, main and front one,  wood interior and  headliner 95% complete. What was done in the boat interior? + Galley rebuilt in the same shape as original. + New Teak wood butcher block countertop made. Individually made cover over the sink. All openings lids made without interrupting  wood planks. + Added flat locker under stove compartment. + Made starboard lockers over the settee top. + Duct work for A/C hidden inside the starboard top lockers to distribute cold/hot air in both cabins. + Ducts have button controlled flow redirect to switch which cabin gets more air. + Custom made wood air outlets with deflectors to distribute air more equally. + Custom made roulette type bamboo doors on all new lockers. + "bookshelf" on port side. + Made brand new cabin table from solid teak wood. + Rebuilt chart table, installed 21" built in display, made compartment and wall to mount electronics. + Replaced starboard bulkhead.  + Replaced all Window ports....