Day 205, Fixed windows trim frames, finishing AC cabinet, 12V outlets installation, several small things complete.
Day 206, New Fixed windows trim installation.
Interior (small things)
Fixed windows
New trim around fixed windows made out of teak and installed. each trim piece made of 4 parts. all cut on my workshop CNC out of teak wood. Only thing left here - paint the gap between window and trim.Other things done today
Made and installed Door-cover under the AC inlet.
LPG sensor - alarm installed.
Other small things
Interior work officially "almost done". But some imperfection left for future.
Interior imperfections listing
Some of them I will leave for future, some just leave as is.
Chain plates - headliner connection need trim plate
Starboard chainplate. |
Port side chainplate |
Portside open shelves headliner to back liner connection has gap about 1/2 inch. also stanchion mounting block is not covered or even pained. Headliner to nav station connection needs trim.
Portside shelves, stanchion block |
Portside shelves, headliner |
Other thing, gelcoat on the bottom shelf is damaged and stained.
Galley - gap between back liner and cabinet wall.
Galley cabinets, minor paint damages.
Nav station, gap between panels, need backer plate to hide shiny thermal insulation.Front cabin, over v-berth, trim is not joined well. Likely it will stay this way forever.
Little white touch-up needed here as well,
Head door needs sloped plank to let water drip into the shower pan if some water will try to run out.
Comments
Post a Comment