Day 173 10/26/24 Engine oil change, Exhaust sustem inspection , cabin table dry fit, old cabin sole plywood demolishing

I planned a long, productive day, but it appeared a very short, However some things was done.

Interior

Cabin sole

Cabin sole floor demolishing started. leftovers of water damaged plywood removed from the front cabin. My younger son helped a lot.

Main cabin and galley left to do.

We found the original Teak&holy floor was just decorative, it was 1/4" thick or even thinner.

<<picture will update later>>

I am looking for options to make PVC flooring, likely I will do it with rigid locking planks, like laminate floor, but PVC

Cabin table 

Checked how it fits the slipping place  to be set as sleeping platform.

 
It is nice, is not? However when I made it I  did "little improvement", I mare corners radius the same and make exact 90 degrees corner. Now I know  I had to make it EXACT as original one. I appeared it does not fit to place as it should to be a part of sleeping platform. It has a 1/2" gap and holding ribs are about 3/4, so, it will not sit tightly.

Engine

Exhaust

I checked the exhaust piping construction. I is made out of 1-1/2 black metal (likely water plumbing) pipes.

Does it work - sure, will it work for a while, maybe.

Is mixing "elbow" works great? maybe :-) But i do not like it.

May I redo it... maybe, later - likely.

Dimensions, just in case.


 


Comments

  1. Viktor, I am also a Irwin IC34 owner (1980) and have begun a few major renovations. Your work is very inspiring!!! THX for posting these updates. Cheers and Happy 2025. Best, Carl

    ReplyDelete
    Replies
    1. You are welcome. How much renovations are you planning?

      Delete
  2. Carl, thanks for warm words

    ReplyDelete

Post a Comment

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total