Day 192, Engine coming back to the boat.

 Engine

Preparing engine to travel. Engine secured  to dolly. 3/4 plywood "skid board" mounted at dolly foot.



7:30AM came to marina.
Assembled the crane, hoisted engine and moved car out.
Good buy my crane, crane was made from 2x4  and 4x4 posts. Worked well for me all time I worked on engine. I decided to "donate" it  to the marina community.
Engine waits to descended.

Descend in progress. 

Two cars used.  Rope tied to engine, goes to pulley on the to of the hill. (block mounted on the car hatch),. then rope goes to second car. Second car controls rope tension. 

To slide on stairs we used 4 boards. 2 at time.



Came to the boat, chain hoist set on boom to load an engine.
In a process of hoisting
Engine is on the boat!
Lowering it in the engine compartment.
A lot of effort to put it on the place, but we have done it !
Engine is at home ;-)







 

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 182 1/1/25 Engine haulout, added handle to refrigerator lid.

Day 180 12/07/24 TIME TO SHOW INTERIOR & Cabin sole rebuild completed, Big cleaning.