Skip to main content

Day 171 9/29/24 Deck painting bow area, all hardware reinstalling on the bow, chainlocker hatch.

 Deck

Chain locker 

Pulpit , reinstalled back with 3m UV4000 sealant ( mainly to avoid tapped in FG thread to be filled with butyl. Original screws used.
Lifeline rains and cleats bedded on butyl tape.

Chain locker hatch spitted on half, front side is removable and locked on position with turn latch.
Aft (bigger part), sits on hinges and opening from starboard to port. Handle changed to have a latch to prevent chain locker from opening  and dumping chain overboard if boat will be inverted. ( Hopefully will never happened).

Latching cam mechanism.

Just one more view to the bow

It is it for today.



Comments