Day 117, 12/9/23 Front cabin and head wood varnishing prep. 10 hours

 Interior

Front cabin and Head

Dry-fit of  all wooden parts, cabinet countertops and drawers.

Prep work for varnishing interior wood across Front cabin and head (toilet).

I removed most of removable trim, Head lockers doors, and door and took all home to prime all parts and likely varnish as well.

Sanded all surfaces. 

Vacuumed and wet cleaned  all surfaces to eliminate dust as much as I can. A lot of cleaning.

Masking taped all things have not be varnished.

 End of the day pictures front cabin

 

 


 

 

 

 

Head:

 

A lot of cleaning. 

Pressurized water.

Had to fix leakage under galley sink.

Pressurized water, one of clamps on PVC hose between pressure accumulator had to be tighten. as well pressure accumulator screws was not put tight. 

So, leakage fixed.


Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total