Day(s) 108, 10/7 and 10/8/23 Interior work, 8 hours total

 Interior

 After month preparation and 2 weeks vacation out of country we  finished painting galley cabinets and main bulkhead with gray finish paint.

 

Paint main bulkhead from main cabin side to make visually more space and match colors of bulkteads. Port side is original with teak veneer and starboard side is  new one with mahogany finish. 

Also make accent coloring galley base cabinets.

Spent about 3 hours with Maria to clean as much as possible dust by vacuuming and wet rug wiping all surfaces in main cabin. Trust me there was a lot of dust.

So, we put 2 layers of Interlux Brightside (polyurethane one part) paint in Seattle Blue color. Used roll and tip technique as we did paining head walls.  Only difference, I bought Redtree - 2" Badger Brush for tipping. It is not cheapest on the market ;), but it payed off every cent I spent for it.

In process


 2 layers was done with ~18 hours dry time between. then in 24 hours masking tape removed.

Work finished


Was 




Couple pictures how it was when I get the boat.











Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total