Things are done since 10/29/24

 

Things was done  since 10/29/24

  • Replaced Cabin sole with hard PVC panels
  • Replaced cover around manual bilge pump
  • 3d printed breakers blockers to avoid switching on or of by mistake
  • Reinstalled cockpit compass at lower position. 
  • Connected foot water pump to the water system.
  • Added pedestal guard in the cockpit.
  • Engine hauled out.
  • Engine tested, injectors tips replaced, injection time adjusted to spec, compression, oil pressure tested. 
  • Engine converted to fresh water cycle
  • Made and installed engine monitor module to monitor engine parameters under way. Temperatures, oil pressure, coolant level e.t.c.
  • Installed cabin table with pneumatic lift to height adjust.
  • Rebuilt engine mount beams 
  • Replaced engine mounts.
  • Made all cabin cushions.
  • Made cockpit cushions. 
  • New navigation computer installation, IP68 box and base board providing additional USB ports, and other Open plotter features.
  • Installed 12V outlets.
  • Installed 6 GAL Water heater. 
  • Added shower controller and thermostatic valve. 
  • Added LPG valve controller/timer.
  • Installed LPG leakage ALARM. 
  • Made and installed sail-pack for main sail
  • Boat transported from Lake Travis (Austin, TX) to Boatyard with exit to Galveston bay and Gulf of Mexico in Dickenson, TX.
  • Bottom cleaned from paint hundreds small blisters and couple tens of mid size fixed.
  • Two places had deep de-lamination on sides at waterline level re-glassed.
  • Smashed front edge of the keel ground out and rebuilt. 
  • 40 years old bronze gate valve thru-hulls replaced with ball-type Marelon thru-hulls. 
  • Independent thru-hull for HVAC added and piping redone to eliminate air-bobble  lock in the hose.
  • Cockpit drains redone to discharge water directly under the cockpit. Hoses crossed to eliminate back-flooding.
  • One sq. foot lightning protection grounding plate installed.
  • Barrier coat applied to Bottom.
  • 3 layers of Totalboat Spartan paint applied. 
  • Topsides tainted with two-part polyurethane paint (Alexseal). 
  •  Mast cleaned and covered with nyalic coating
  • Mast wiring replaced 
  • Radar bracket installed
  • New LED steam-light installed. 
  • New 3-color/anchor light installed on mast top 
  • Engine raw water strainer added. 
  • Cutlass bearing replaced.
  • Driveshaft seal replaces with drip-less shaft seal.
  • Propeller and shaft cleaned and re-polished. Lano-coat applied. 
  • Rudder skin repaired and shaft to glass areas reworked with epoxy.
  • Bottom rudder bearing block rebuilt.
  • Strut is tighten and re-glassed to the hull. 
  •  Rudder stock stuffing box re-stuffed.
  • Boat moved to Kemah Boardwalk marina. 

 

ak     NEED TO BE ADDRESSED LATER·    

·         [Deck] add "safety strap" to keep engine and LPG lid attached to the boat.

  [out of water] Centerboard has lateral crack - need to be prepared to repair it. [nothing to do before hulling boat out of water. Not critical due to centerboard ballast made from lead pallets seeped in epoxy.]

 [out of water] Centerboard pivot axle if slot. centerboard is knocking when boat shakes side to side

[out of water] centerboard lift line pipe has to be straightened and reclamped. [planned at time when boat will be on dry]

[mast] front chainplate had welded pin for pulpit ind was ripped out. Looking to replace chainplate. [chainplate ordered, need to order one mere piece and weld them or bolt and make it overlapping in the pin.]

·         [Engine] add buzzer to engine alarm lamps (LOUD buzzer).

·         [Structural]  Epoxy wood connection between bulkhead parts. 

 



  

 

 

 