Progress report #4, Since Nov 28 2022

Things are done since 11/28/22 Front cabin walls (hull sides), put 1/2" neoprene isolation. Rebuilt front cabin headliner Repaired front cabin hatch (more attention required) Pressurized fresh water piping completely redone. Including hot water priming valve and connection between tanks. Head walls filleting to shower pan and walls painting Roulette cabinet door made ind installed. Starboard side bulkhead between engine compartment removed de-laminated glass Backstay chain plate replaced, backer plate added. Installed holding tank back and new black water hoses, check air hose Re-glassed very aft bulkhead and lateral wall which keeps ruder turn blocks. Starboard cockpit locker area, re-glassed de-laminated hull layer structure. Looks like hull was originally reinforced in docking area by Irwin, but it was done over gelcoat layer. Install cockpit locker walls and painted locker inside. Moved A/C raw water pump in bottom of galley cabinets an...