Progress report #4, Since Nov 28 2022

 


Things are done since  11/28/22

Front cabin walls (hull sides), put 1/2" neoprene isolation.

Rebuilt front cabin headliner

Repaired front cabin hatch (more attention required)

Pressurized fresh water piping completely redone. Including hot water priming valve and connection between tanks.
 
Head walls filleting to shower pan and walls painting
Roulette cabinet door made ind installed.

Starboard side bulkhead between engine compartment removed de-laminated glass

Backstay chain plate replaced, backer plate added.
 
Installed holding tank back and new black water hoses, check air hose 
 
Re-glassed very aft bulkhead and lateral wall which keeps ruder turn blocks.
 
Starboard cockpit locker area, re-glassed de-laminated hull layer structure. Looks like hull was originally reinforced in docking area by Irwin, but it was done over gelcoat layer. Install cockpit locker walls and painted locker inside.

Moved A/C raw water pump in bottom of galley cabinets and suspended it to eliminate vibration.
Install new A/C air outlets and inlet grille.

Built starboard shelves with roulette doors. 
 
Built refrigerator in the ice chest. 

Built bimini

Big cockpit navigation monitor.
Galley "upper cabinets" built.

Galley cabinets reinforced. and new doors/ drawers built.
Cabinet under sink have got removable  shelf to be able to store things there and have access to pumps.
 
New countertop in galley installed  
 
Installed New Faucet installed in galley.
 
Installed 15" cockpit Display with touchscreen for OpenPlotter. instead of Port window between galley and cockpit.
 