Day 95. 6/17/24, Galley countertop final installation, Vent installation, LPG drain line fix 12 hours
Galley
Countertops and "top" cabinets permanently installed.
New faucet set and connected.
Made removable shelf over "pumps" compartment. Nice place for trash bin and cleaning supplies.
LPG box drain line connection epoxied and glassed with 4-5 layers
Also line secured to locker "bulkhead" (on right) to avoid movement leading break again.
LPG valve installation.
Deck
Vent installed and drain hole added to Dorade box.
Electric
Galley outlets installed now. 4 outlets :-)
<< Check picture on the post above>>
Made and installed "bottom" plate for distribution panel compartment separating it from engine room.
<< NO Pictures>>
Designed new electrical panel
Comments
Post a Comment