Day 95. 6/17/24, Galley countertop final installation, Vent installation, LPG drain line fix 12 hours

 



Galley

Countertops and "top" cabinets permanently installed.
New faucet set and connected.


Made removable shelf over "pumps" compartment. Nice place for trash bin and cleaning supplies.





LPG box drain line connection epoxied and glassed with 4-5 layers  

Also line secured to locker "bulkhead" (on right) to avoid  movement  leading break again.


LPG valve installation.

 Deck

Vent installed and drain hole added to Dorade box.

Electric

Galley outlets installed now. 4 outlets :-)
<< Check picture on the post above>>

Made and installed "bottom" plate for distribution panel compartment separating it from engine room.

<< NO Pictures>>

Designed new electrical panel


 

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total