Skip to main content

Posts

Day 34-35, 7/2-7/3, Mast climbing, small projects, 18 hours

 Friend on the mast  Eugine Konovalenko climbed to the mast to inspect stays, connections, mast top, blocks e.t.c Standing rigging Starboard Spreader     Portside spreader Forestay fail.   One strand is broken, other unsinned. Spreader lights Steam light mount (really?) Top stays toughs            Mast top  Light needs laps replacement and cleaning, Blocks are ok but need to be little lubricated,  looks like clevis pins will require to be replaced at some time sooner than later. Antenna and cable - to replacement, windex mount sized and need to be removed, \   Spreader boots are almost disintegrated. Need to be replaced.  Hull    Sand and patched scratches on a bow and starboard 2 times. Looks like next time just minor sanding and priming. Motor compartment lid.  Put little rubber gasket (whether ribbon for windows, but it is ok for now) on a lid and cut extending top of the bulkhead interse...