Day 188, Engine mount angles dry fit and adjustments before paining. Galley countertop re-oiling.Cushions calculations.

 Engine  

Mounting angles drilled and taped.

Dry fit them on place to make sure they fit and engine mounts will be positioned properly.

Pre-drill  holes in the wood blocks for lag bolts. 

Planning to prime and paint steel to protect it from elements. 



 

Interior

Re-oiled galley countertop.

Calculated cost of materials for interior cushions. 

Proximate dimensions of all pillows to calculate how much materials I need. 

Total facing canvas required - 20 yards and 10 yards backing.

7 zippers - about  40 ft total length

+ 204ft, (68 yards) of piping (not in the list)
 


 

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total