Day 188, Engine mount angles dry fit and adjustments before paining. Galley countertop re-oiling.Cushions calculations.
Engine
Mounting angles drilled and taped.
Dry fit them on place to make sure they fit and engine mounts will be positioned properly.
Pre-drill holes in the wood blocks for lag bolts.
Planning to prime and paint steel to protect it from elements.
Interior
Re-oiled galley countertop.
Calculated cost of materials for interior cushions.
Proximate dimensions of all pillows to calculate how much materials I need.
Total facing canvas required - 20 yards and 10 yards backing.
7 zippers - about 40 ft total length
+ 204ft, (68 yards) of piping (not in the list)
Comments
Post a Comment