Day 176 11/16/24 Floor cleanning, floor templates made.

Interior

Cleaned floor from sealant adhesive leftovers, sanding gelcoat to make fresh surface and remove "ups" epoxy  drops. First run around is complete.  

Grind openings in the floor was done to investigate area around compression post, prepared area fro re-glassing.





Sailing

Afternoon  we get out for sailing. nice day 10-20 knots wind.

Upwind  sailing

Speed is 6.1 knots (11 km/hour)

Wind 17 knots

boat heel 23.8 degrees, yes we are overpowered.




Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total