Things are done since 12/20/23
Things are done since 12/20/23
[Deck] Cabin top, cockpit, decks fixed, patched, refinished and painted with 2 part Interlux Perfection paint and Kiwigrip non-skid. It took 130 hours of work, 19 work days, during 14 weeks deck painting officially done.
[Deck] New aluminum hatches installed. It required rebuilding deck around hatches.
[Deck] New Fixed windows cut with wire flange and to be able to screw them to cabin top, reinstalled on DOW795 and screws.
[Cabin] Cabin interior varnishing complete.
[Cabin] Portside lockers painted.
[Cabin] Refinished companion way steps
[Cabin] Put covers on cockpit display back and inverter/charger locker.
[Cabin] Head door installed.
[Cabin] added support planks for refrigerator lid. (small thing).
[Cabin] Slide drawer installed in galley under starboard cockpit sit.
[Electric] Fresh water and Black water tank level indicators installed.
[Electric] Mast wiring tided up and mast cables gland installed.
[Electric] Replaced all battery cables with right marine grade wires.
[Electric] Installed new battery switches.
[Electric] Battery charge isolator to charge batteries from alternator.
[Electric] Battery monitors installed and monitor display connected.
[Electric] Installed Shore DC power supply.
[Electric] Installed 3KW inverter and lithium 2.5KWh “inverter” battery.
[Electric] Added buzzer on main bilge pump circuit.
[Navigation] Installed RPi based Openplotter and display on nav desk.
[Navigation] Added display signal splitter to duplicate image between Cockpit screen and nav desk.
[Navigation] Mast top wind instruments and Wifi camera installed and connected to Openplotter
[Navigation] Depth finder and log connected to open plotter
[Navigation] Autopilot rudder drive and rudder angle sensor installed and connected.