Progress report #5, Since Jun 27 2023

 

 


Things are done since  6/27/23 till 12/19/23

New electric panel installed

New wiring system connected and old one disconnected and cut short.

Planned windlass installation place
 
All wiring but battery cables replaced with tinned copper marine grade cables.
Battery cables will be updated later.

New electrical panel installed.
 
LPG piping rebuilt.

24V LED lighting  installed around the cabin. 
 
Rebuilt ice chest. Re-insulated and  added 110V refrigeration system .  Plan to use dedicated inverter to power it.

A LOT OF INTERIOR WORK done.
 What was replaced, All headliner,  Headliner holders (teak planks), New Starboard shelf with "rollete" doors, new "bookshelf" built in starboard, Rebuilt navigation desk, Made drawer in a cavity on galley countertop in between companionway wall and LPG tank, Port side cabin top wall liner geometry changed to make access to area under portside cockpit bank and many other things.

 Interior rebuilt complete, all wood surfaces are varnished.


 