Day 118, 12/26/23 Fixed window ports replacement, Small things. 8 hours

 Fixed port windows 

Made and replaced port windows, New windows screwed to the cabin every 75mm. Set on DOW795. fiberglass and gelcoat sanded with 220grit and cleaned with 50/50 IPA solution. 

Detailed story is Here


Interior

Installed back finished doors in front cabin.



 

Installed head door.
 


Cabin sole.

Tried to lite grind (350grid) stained floor gelcoat in main cabin under the table. Get pretty good results. Gelcoat has descent thickness to be re-sanded and re-polished. 

Small piece at time.

Was 

Result
 

Refrigerator chest lid support

Epoxied two slats on long side of opening.


Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total