Day 114, 11/18, Head door dryfit, Priming all wood in main cabin with wood sealer before varnishing rush, 10 hours

Interior

Head door

When I bought the boat, head door wad lost.

Looks it is time to make it. 

I am looking to design and build door similar one to airliners toilet doors. Folding door will fold inside the head room.

I have prepared Door panels and vertical parts of the frame with installed hinges. assembled and dry-fitted it to frame, after some adjusting was able to install it.

Door opened

Door closed (from inside)

Galley cabinet door installation.

Last door installed  (after 2 failure attempts :-))



 

Main cabin wood varnishing (including prep)

This day I did 2 additional layers of wood sealer on plywood and 2 layers on all bare wood in main cabin.
 
All trimming is recovered original teak and new made panels are meranti marine grade plywood.  After first layers of sealer they started to play different colors and make nice two color interior accents.

Next week plan to do final sanding and start to put varnishing (Gleam 2.0).








Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total