Day 100 7/22/23, Main bulkheads and galley cabinets priming 8 hours

Interior

Work really slow down due to I need to wait  stuff to get dry/set.

Galley cabinets

After first layer priming i realized he problem - plywood REALLY needs to be sealed with wood sealer before painting. So i had to sand out the first layer i did and recover all things with 3 layers of wood sealer to almost avoid wood (plywood) grains showed on panels I am planning to paint.

 It is a lot of time to do, but result after 3 coats is very impressive. 

BUT - will see after priming and painting.

 

 

Main bulkhead wood sealing.

I am planning to paint Main bulkhead. It is for cosmetic reason only. Wood is not wet or rotted .

First step is wood sealing to fill wood grains to get better adhesion and cover then.





 

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total