Day 90. 5/13/23, Bimini, Galley base rebuild, Removing original electric panel 10 hours

 Bimini top



 

Nice new skin on my bimin. Sewed, tried, installed. BUT after i assembled all i found interesting thing.

Original (previous owner installed) mounts sit in place where they interact with winches and jib sheet cleats.

 So I need to revert  bimini and move it back for 10-15", there some interaction with furler cleat will be, but it is not hard to fix.

Bimini tubing diameter


Galley

Not a lot of pictures, But front panels are fitted and next step is build new drawers module.

Counter top pieces are measured to be cut in size. 58" and 68"







New drawers set 3d model. Two 4"  and two 6" drawers



 

Electrical

Battery charger moved to permanent place

Original panels removed, Temporary connections made to be able to use electric. installed fuses - 15A on DC and 25A on AC.
Made shelf for inverter installation.



Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total