Day 90. 5/13/23, Galley base rebuild, Countertop template, Bimini, 8 hours


Interior, galley

Front panel and brand new drawers box installed


Dry fit first, then assemble on glue.

New drawers use all space in the cabinet. (original drawers were half size only).

Template countertop. Maid "exact" templates.

Electronics.

Display opening cut out all went well until bearing found way to get out of routing bit. as result edge need to be reworked. Likely will do new template (10mm bigger) and route again. 

< No pictures, sorry >

Bimini top

Reinstalled bimini, moved it about 15 inches aft. Glassed old holes. 

Now it is not interfering with winches and ropes.
 < No pictures, sorry >

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total