Day 85. 4/15/23, Refrigerator, Galley, Electrical , 8 Hours.

 Refrigerator

Condenser mounted on the back side of the LPG locker.

System assembles, soldered (hope well ;-)

It was really crazy to braze pipes on the FG boat using MAPP torch (no oxygen).

I used set of wet rugs and couple stainless plates to prevent fire. Fire extinguisher was put  handy  next to the torch


Interior

Galley rebuild

Finished bulkhead, added final piece and slightly glassed all around.

Building finishing structure around refrigerator top.


Some hidden space formed Pretty big one, but I can't figured how i may use it,


 Added internal layer in right top cabinet. 1/4 PVC Sintra panels used.

 

Finished for today.

Electrical

Looking forward to build breaker panel  I re-checked wiring.



Mounted several woodblocks to be able to zip-tie wires on entrance to electrical panel



Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total