Day 85. 4/15/23, Refrigerator, Galley, Electrical , 8 Hours.
Refrigerator
Condenser mounted on the back side of the LPG locker.
System assembles, soldered (hope well ;-)
It was really crazy to braze pipes on the FG boat using MAPP torch (no oxygen).
I used set of wet rugs and couple stainless plates to prevent fire. Fire extinguisher was put handy next to the torch
Interior
Galley rebuild
Finished bulkhead, added final piece and slightly glassed all around.
Building finishing structure around refrigerator top.
Some hidden space formed Pretty big one, but I can't figured how i may use it,
Added internal layer in right top cabinet. 1/4 PVC Sintra panels used.
Finished for today.
Electrical
Looking forward to build breaker panel I re-checked wiring.
Mounted several woodblocks to be able to zip-tie wires on entrance to electrical panel
Comments
Post a Comment