Day 76, 1/14/23 Shower walls patching, and priming aft wall - 6 hours
Interior
Head (toilet room)
2. all links between walls and flour primed as well.
3. Hole I made during piping patched and filled.
4. I made teak wood insert to cover "hole in a wall" and make additional compression support for bulkhead.
[No picture for now]
Primer is not self-leveling well, however looks not bad on the picture. ;)
Right side was not planned to be primed, but I had primer leftovers, so i used them.
There was little to no prep work, will test adhesion next time.
PS: Interlux prime-cote smell literally "smoked" me out of boat. It was short day.