Day 76, 1/14/23 Shower walls patching, and priming aft wall - 6 hours

Interior

Head (toilet room)


1. Left "wall" primed (1-st layer)

2. all links between walls and flour primed as well.

3. Hole I made during piping patched and filled. 

4. I made teak wood insert to cover "hole in a wall" and make additional compression support for bulkhead. 

[No picture for now]

Primer is not self-leveling well, however looks not bad on the picture. ;)

Right side was not planned to be primed, but I had primer leftovers, so i used them.

There was little to no prep work, will test adhesion next time.


 PS: Interlux prime-cote smell literally "smoked" me out of boat. It was short day.

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total