Day 75, 1/7/23 Shower walls gaps glassing sanding and fairing, dry bilge system design POC, check manual bilge pump- 8 hours

 Interior

Sanded over glass to surface transition.

Patch edge between surface and joint

Replaced screws mounting forward wall to in-liner with countersink bolts.

Slightly opened all holes and patched them.

Sanded (scarfed) left wall to be able to prime it.

 




 

Systems

Dry bilge pump POC testing

Box with sponge and membrane pump, works perfect.

 



Manual pump  testing

I was able to pump it out within about minute or two. It was hard to prime, but doable.