Day 75, 1/7/23 Shower walls gaps glassing sanding and fairing, dry bilge system design POC, check manual bilge pump- 8 hours
Interior
Sanded over glass to surface transition.
Patch edge between surface and joint
Replaced screws mounting forward wall to in-liner with countersink bolts.
Slightly opened all holes and patched them.
Sanded (scarfed) left wall to be able to prime it.
Systems
Dry bilge pump POC testing
Box with sponge and membrane pump, works perfect.
Manual pump testing
I was able to pump it out within about minute or two. It was hard to prime, but doable.