Day 69, 12/17/22 Front cabin Walls, and ceilling installation. Front hatch restoration and resealing. 8 hours

 Interior

Front cabin almost done, trimming left to do and we will be good.

Little bit boat yoga

 

 

Head walls sanding before front cabin neoprene walls in-liner installation (to eliminate unnecessary dust exposure).

Thru-hulls 

New bronze pipe-to-hose adapters installed.

Yes it is rat nest, but boat in the water and i do not see way to redo it.

Only one plastic adapter left

Deck

Front hatch re-sanded, re-bedded and re-assembled
 <<< pictures will be later>>>

Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total