Progress report #3, Since Sep 25 2022

 


Things are done since  9/25

  • Cockpit drains replaced.
  • Re-setup fixed window (it was not bonded well)
  • Engine room ventilation hose and scoops mounted
  • New VHF/AIS antenna and cable replaced 
  • New LED spreader lights installed.
  • Day Water tank leakage repaired (osmosis, leaking crack in a bottom)
  • Main water tank repaired (bad osmosis and hole in bottom) 
  • Both tanks re-coated inside with special portable water 2 component coating.
  • New HDPE lids made and installed to both fresh water tanks to make water tanks safe.
  • Water level sensor added to main and day fresh water tanks.
  •  Stanchions repair finished, all filled with poly resin and rubber plugged from bottom, then reinstalled.
  • New dynema lifelines installed. one piece still need to be replaced.
  • A/C in and out collector boxes, air outlet boxes and duct work.
  • Front cabin cabinet structure rebuilt around AC.
  • Main sheet traveler re-bedded
  • Cabin top winch re-bedded 
  • Cabin top aft hatch repaired and renovated. (left wooden, I like it)
  • Cabin top winch re-bedded
  • Port side bulkhead, tabbing added from head side and deck.
  • Work on sanding interior wood started

 