Day 53, 10/22, Paint Day Water tank, Ceiling support shims 6 hours work
Just Vira exterior now.
Water tank
Water tank painted second coat.
Electrical system.
Changing power cutoff voltage on 3kW invertor to get it work with Li-OIN 10.8V battery.
There 20K ohm resistor on the small control board had to be adjusted.
Battery box fit check. It appeared exact size of locker next to original batteries.
Cabin
All parts was cut, preinstalled named, then mounted back
Each slat hold with 2 small screws to hold it on place until epoxy set.
Comments
Post a Comment