Day8, 1/14, telegraph installation back, 2 hours

4 hour cut, several times restart and new mounting plate for motor control was built.

 Designed

 



And cut from 1/4 aluminum



Fitted


And installed


New shift cable works well. 

Found the accelerator cable is set the way it is over-pushed causing extencive resistance on handle.

Needs to be adjusted on the engine side.

 

Check  fit for restored companion way insert. Looks nice.

 


Comments

Popular posts from this blog

Day 183 1/5/25 Take engine home.

Day 138, 4/6, Deck priming, 2 days, 8 hours total