Things are done since 6/12/24 [Comfort] Barton winchers installed [Safety] Big c hain locker rebuilt [Safety]Windlass installed [Safety] Big bow anchor roller installed [Cosmetic] Bow area patched and painted [Structural] New companionway hatch made and installed [Navigation] Autopilot drive installed [Engine] Fuel tank repaired, new solid FG tank lid made and installed. [Engine] Emergency/service fuel lift pump added [Engine] Two stage Primary fuel filters (30 and 10 microns) added [Engine] All fuel lines replaced with A1-15 hoses [Navigation] Autopilot rudder drive end switches to installed [HEAD] Holding tank check air hose, filter installed, went goes to chain locker.
Refitting and restoration 44 years old Irwin Citation 34 sailboat. Originally Blog is made to motivate myself to continue this hard work. DIY Step by step work. Working almost single-handed. Going to make the boat seaworthy and put it in salt water. Most records are just reminders what and when was done. If you are interesting in some details, please put request to comment. I will provide more information.