Progress Report sinse 02/19/2026

Things was done since 10/29/24
- Installed AIS Transponder on 6' pole at the transom.
- Added night mode to Main breaker panel to dim indicator LEDs.
- Radar installed.
- Installed 25A charger for inverter battery.
- Mast lightning grounding connected and wire hidden over wooden trim.
- New main sail.
- New standing rigging installed.
- Helm navigation station designed, made and installed.
- Marine ELCI replaces Domestic GFCI module.
- Variable speed fresh water pump installed.
- Electric Fresh water toilet installed.
- Refrigerator compressor replaced with DC model.
- Refrigerator smart thermostat designed, made and installed.
- Refrigerator lid designed, made and installed.
- New Outhaul setup.
- 4 reefs installed, new reef lines and boom winches.
- Windlass motor replaced for brand new.
- Anchor shackles replaced.